FUJITSU K9900543020 aka 9900543020  THERMISTOR VALVE PIPE FUJITSU K9900543020 aka 9900543020  THERMISTOR VALVE PIPE

Brand: FUJITSU

FUJITSU K9900543020 aka 9900543020 THERMISTOR VALVE PIPE

(0)
This part fits the following Fujitsu outdoor condenser unit models: AOU18RLXFZ AOU18RLXFZH AOU24RLXFZ AOU24RLXFZH AOU24RML AOU24RML1 AOU36RLXFZ AOU36RLXFZ1 AOU36RML AOU36RML1
$129.00
More FUJITSU K9900543020 aka 9900543020 THERMISTOR VALVE PIPE
Special Order. No Return. Usually ships in 2 - 4 business days. Authorized Fujitsu Installation Dealer.
36 in. x 16 in. Diversitech UltraLite® Lightweight Concrete Equipment Pad UC1636-2 36 in. x 16 in. Diversitech UltraLite® Lightweight Concrete Equipment Pad UC1636-2

36 in. x 16 in. Diversitech UltraLite® Lightweight Concrete Equipment Pad UC1636-2 (2 in. thick)

(0)
A concrete shelled pad with the weight of plastic, strengthened by a fiber-cement coating, flexes instead of cracking or breaking. The textured surface prevents unit slide and allows water drainage, while the engineered core prevents warping and provides a solid bottom to resist settling. Unaffected by soil conditions, UV, temperature extremes, and other...
$43.00
More 36 in. x 16 in. Diversitech UltraLite® Lightweight Concrete Equipment Pad UC1636-2 (2 in. thick)
In stock
On sale! Daikin 9,000 btu 24.5 SEER Heat Pump & Air Conditioner Ductless Mini Split FTXS09LVJU / RXS09LVJU Daikin 9,000 btu 24.5 SEER Heat Pump & Air Conditioner Ductless Mini Split FTXS09LVJU / RXS09LVJU

Brand: DAIKIN

Daikin 9,000 btu 24.5 SEER Heat Pump & Air Conditioner Ductless Mini Split FTXS09LVJU / RXS09LVJU

(0)
FEATURES Intelligent eye occupancy sensor Weekly timer for programmable comfort Low ambient heat operation down to 0° F 12 year limited parts and compressor warranty with online registration
$1,949.00
More Daikin 9,000 btu 24.5 SEER Heat Pump & Air Conditioner Ductless Mini Split FTXS09LVJU / RXS09LVJU
Special Order. Non-Returnable. Usually Ships in 4 - 7 business days. Authorized Daikin Installation Dealer.
All best sellers
  • Banner

    Banner left 1
FUJITSU K9316562011 AIR FILTER 9/12RL HY
  • FUJITSU K9316562011 AIR FILTER 9/12RL HY

FUJITSU K9316562011 AIR FILTER 9/12RL HY

FUJITSU

This Part is used in the following Models
ASU12RL    
INNER UNIT - 12000 BTU SPLIT H/P
ASU9RL  
INNER UNIT - 9000 BTU SPLIT H/P

Volume discounts

Quantity Unit discount You Save
4 1.5% $5.47
8 3.5% $25.52
16 7.5% $109.38
$91.15
Quantity
Special Order. No Return. Usually ships in 2 - 4 business days. Authorized Fujitsu Installation Dealer.
100 Items

  Security policy

(edit with the Customer Reassurance module)

  Delivery policy

(edit with the Customer Reassurance module)

  Return policy

(edit with the Customer Reassurance module)

Description

Product Details
100 Items
GPSR

Brand: FUJITSU

Comments (0)
Grade
No customer reviews for the moment.
16 other products in the same category:

Follow us on Facebook