36 in. x 16 in. Diversitech UltraLite® Lightweight Concrete Equipment Pad UC1636-2 36 in. x 16 in. Diversitech UltraLite® Lightweight Concrete Equipment Pad UC1636-2

36 in. x 16 in. Diversitech UltraLite® Lightweight Concrete Equipment Pad UC1636-2 (2 in. thick)

(0)
A concrete shelled pad with the weight of plastic, strengthened by a fiber-cement coating, flexes instead of cracking or breaking. The textured surface prevents unit slide and allows water drainage, while the engineered core prevents warping and provides a solid bottom to resist settling. Unaffected by soil conditions, UV, temperature extremes, and other...
$43.00
更多 36 in. x 16 in. Diversitech UltraLite® Lightweight Concrete Equipment Pad UC1636-2 (2 in. thick)
库存充足
促销! Daikin 9,000 btu 24.5 SEER Heat Pump & Air Conditioner Ductless Mini Split FTXS09LVJU / RXS09LVJU Daikin 9,000 btu 24.5 SEER Heat Pump & Air Conditioner Ductless Mini Split FTXS09LVJU / RXS09LVJU

品牌: DAIKIN

Daikin 9,000 btu 24.5 SEER Heat Pump & Air Conditioner Ductless Mini Split FTXS09LVJU / RXS09LVJU

(0)
FEATURES Intelligent eye occupancy sensor Weekly timer for programmable comfort Low ambient heat operation down to 0° F 12 year limited parts and compressor warranty with online registration
$1,949.00
更多 Daikin 9,000 btu 24.5 SEER Heat Pump & Air Conditioner Ductless Mini Split FTXS09LVJU / RXS09LVJU
Special Order. Non-Returnable. Usually Ships in 4 - 7 business days. Authorized Daikin Installation Dealer.
最畅销款汇总
  • Banner

    Banner left 1
FUJITSU K9900343019 aka 9900343019 CHOKE COIL RACi
  • FUJITSU K9900343019 aka 9900343019 CHOKE COIL RACi
  • FUJITSU K9900343019 aka 9900343019 CHOKE COIL RACi
  • FUJITSU K9900343019 aka 9900343019 CHOKE COIL RACi

FUJITSU K9900343019 aka 9900343019 CHOKE COIL RACi

FUJITSU

$129.00
数量
Special Order. No Return. Usually ships in 2 - 4 business days. Authorized Fujitsu Installation Dealer.
75 商品

  Security policy

(edit with the Customer Reassurance module)

  Delivery policy

(edit with the Customer Reassurance module)

  Return policy

(edit with the Customer Reassurance module)

描述

商品详细信息
75 商品
GPSR

品牌: FUJITSU

评论 (0)
按评分排列
暂无评论。
同一分类中的16其他产品:
FUJITSU K9711214003 aka 9711214003 Wire with connector (Pressure switch—Wire with connector [to Inverter PCB]) FUJITSU K9711214003 aka 9711214003 Wire with connector (Pressure switch—Wire with connector [to Inverter PCB])
$71.11
更多 FUJITSU K9711214003 aka 9711214003 Wire with connector (Pressure switch—Wire with connector [to Inverter PCB])
Special Order. No Return. Usually ships in 2 - 4 business days. Authorized Fujitsu Installation Dealer.

Follow us on Facebook